Feedback Photo Gallery Resources Site Map Career Contact Us


Major Activities

YAP-II envisages a two fold strategies in pollution control and abatement for Yamuna:

  1. Implement schemes, which have visible and tangible impact on the immediate improvement of water quality of the river.
  2. Synchronize engineering and non-engineering components

Specific value-added-components included in YAP-II are as follows:

  1. PP&A Programmes on public involvement in decision making process utilizing numerous NGOs
  2. Public Relations / Information Programme in Delhi
  3. Engineering Technology Transfer (ETT) to ULBs in Haryana
  4. Institutional Strengthening & Capacity Building of the 15 ULBs
  5. Capacity Building for NRCD, which is the Executing Agency for the project
  6. Water Quality Monitoring Programme

The scope of programmes and budget included in YAP-II.

Sl. No. Name of State/Scheme Estimated Cost (Rs. in million)
I DELHI 3871.7
1
Physical Works Implementation
a. Okhla STP
b. Keshopur STP
c. Bela Road Trunk Sewer
d. Wazirabad Road Trunk Sewer
e. Ring Road Trunk Sewer
 
2
Preparation of Master Plan (M/P), Feasibility Study (F/S), Detailed Project Report (DPR) for YAP-III
a. Decentralized Wastewater Treatment for Water bodies (including Pilot Project)
b. Dairy Farm Waste Management (including Pilot Project)
c. Dhobighat Sudhar Yojna (including Pilot Project)
d. Slaughterhouse Modernisation and Waste Management
e. Antim Niwas Sudhar Yojna (including Pilot Project)
f. Slum Rehabilitation Study
3
Public Participation & Awareness (PP&A)
a. Clean Yamuna Manch
b. Other PP&A Programme (Socio Economic & Environmental upgrading Program, School Health & Hygiene Program and Innovative Program)
4 Public Relations (PR)
5
Institutional Strengthening & Capacity Building of MCD
a. Property Tax, Public Participation in solid waste, operation of CTCs etc.
b. Usage of High Resolution Satellite Imagery
c. Training of Sugam Kendra Staff
II UTTAR PRADESH 1241.3
1 Physical Works Implementation
Sewerage Works (Sewers, Sewage Pumping Stations, Rising Mains, STPs) in Northern & Western zones at Agra
 
2 Preparation of Master Plan (M/P), Feasibility Study (F/S), Detailed Project Report (DPR) for YAP- III (8 towns)
3
Public Participation & Awareness (PP&A)
a. Clean Yamuna Manch at Agra
b. Other PP&A Programme (Socio Economic & Environmental upgrading Programme, School Health & Hygiene Programme and Innovative Programme)
4 Institutional Strengthening & Capacity Building of 7 ULBs and Noida Authority
III HARYANA 625.0
1 Engineering Technology Transfer (ETT) to ULBs (6 towns)  
2 Preparation of Master Plan (M/P), Feasibility Study (F/S), Detailed Project Report (DPR) for YAP- III (8 towns)
3 Public Participation & Awareness (PP&A)
4 Institutional Strengthening & Capacity Building of 6 ULBs
IV CAPACITY BUILDING OF NRCD 502.0
1 MIS, Accounting & state-of-art equipments etc.  
2
Water Quality Monitoring Programme
a. Upgrading of laboratories
b. Integrated water resource management and water quality modelling
c. Training to staff and operators of STPs
  TOTAL: 6240.0