SCOPE OF WORK

The Scope of Services indicated in the Request of Proposal for the Consultants is as follows:

  1. Review of Project Component as suggested by Haryana PWD, PH Branch for physical works,
  2. Review of existing sewerage system vis-à-vis its Utilization,
  3. Review of Operation and Maintenance (O&M) of the existing system,
  4. Carrying out field Topography Survey, necessary geo-technical and other investigation, collection of data & information as may be required for preparation of Detailed Project Report,
  5. Preparation & submission of Draft Detailed Project Report (Draft DPR) in discussion with PWD, PH Branch, Government Of Haryana, Project Management Consultants,
  6. Preparation of Final DPR after incorporating of all comments from PMC, PWD, PH Branch & NRCD,
  7. Preparation of Bid documents as per the guidelines provided by Project Management Consultants,
  8. Providing necessary assistance to PMC / PWD, PH Branch in evaluation of bids and award of contract.
  9. Supervision of the construction work to monitor the progress of work including quality control,
  10. Implementation of appropriate Training Programme for ULBs, as per guidelines provided by PMC / PWD, PH Branch / NRCD for Transferring Engineering Technology to ULBs, by organising
  11. Class room training program,
  12. Conducting workshop and seminars on the project implementation procedures.

In addition to this during the project implementation, the Consultant shall submit the following reports.

  1. Inception Report
  2. Survey Report
  3. Draft Detailed Project Report
  4. Final Detailed Project Report
  5. Pre-qualification Document for appointment of Contractor
  6. Draft Bid Document for appointment of Contractor
  7. Final Bid Document for appointment of Contractor
  8. Evaluation Report for bids received from the Contractors
  9. Monthly Progress report
  10. Operation and Maintenance Manual
  11. Supervision Manual
  12. Project Completion Report